← Back to the article "What ideal IT operations look like"

An example for the sign "a dozen measures": one page that the operations team goes through once a month in half an hour. The company and the numbers are made up. The page prints on one A4 sheet.

IT operations: measures for October 2026

Company N · 6 engineers · 38 systems, 9 of them key services
Meeting: 4 November, 30 minutes
Led by: head of operations
Source: incident log, monitoring, change log
6 of 10on target - not discussed
3need attention - a minute each
1over the limit - most of the meeting
Measure October September Target 6 months Status What is behind it
What the business saw
1. Downtime of key serviceshours, planned windows included 7.4 h11.2 h≤ 8 h on target Of these, 3.0 h are planned windows. The longest outage was 2.1 h, email
2. A client reported the outage firstshare of priority incidents 22%12%≤ 10% over the limit 2 of 9: both in the client portal, the availability check does not see it
3. Time to restoreaverage for priority incidents 1 h 40 min2 h 10 min≤ 2 h on target 7 of 9 closed by the on-call engineer with an instruction, no expert
Repeats and debts
4. Repeat outagessame object and cause within 90 days 13%16%≤ 10% attention 4 of 31. Three are one switch in office 2, a problem record already exists
5. Problem recordsopen / overdue 7 / 16 / 00 overdue attention Overdue: power supply swap in the storage system, waiting for the supplier
6. Temporary workarounds older than a quartercount in use 120 on target One left: manual restart of the export to accounting, due in December
Load on the team
7. Alert noiseshare that needed no action 58%64%≤ 50% attention Half of the noise is CPU load thresholds on 4 servers
8. Night callstotal / by the written rule 3 / 35 / 4all by rule on target Not a single call "just in case"
Changes and data
9. Failed changesrollback or outage in the first 24 hours 9%11%≤ 10% on target 2 of 22. Both rollbacks on time by plan, no downtime for users
10. Complete recordsincidents with time, object and outcome 96%94%≥ 95% on target The numbers for this page took 10 minutes, with no manual cleanup

To decide at the meeting

  1. Add a login check for the client portal (measure 2): now monitoring sees that the page opens, but does not see that login fails.
    Proposal: monitoring engineer, by 15 November
  2. Review CPU load thresholds on 4 servers (measure 7).
    Proposal: November on-call engineer, by 22 November
  3. Overdue storage record (measure 5): wait for the supplier or fit the spare unit from stock?
    Needs a decision by the head

Decisions of the last meeting

  • Instruction for restarting the mail gateway - written, 2 outages closed with it
  • Night call rule for backups - written
  • Switch replacement in office 2 - not done, moved to November